End of Line Packaging Solutions for Cement Mortar Factory of Automatic Valve Packing Machine Valve Packer
1. Reasons to choose the PVPE Air Packer
Accuracy & productivity
- High accuracy patented load cell technology
- Air-flow feed-system provides high production rates
- Easy clean-out & changeover of new products using accessible rear hatch
- Speed can be adjustable manually for weight fine-tuning
- Quick adjustment control to suit bag sizes
- Operator friendly controls
International quality build
- Manufactured to comply to International & Australian standards
- Uses quality European component brands such as, Festo, Metalwork, Scheider & SMC
Durable & Easy to Maintain
- Internal & external parts are easy to clean
- Butterfly valve made from high strength anti-wearing material for abrasive products
- Built with universal industrial components to ensure easy maintenance
- Components kept dust-free: pneumatic & electrical control equipment housed in positive pressure enclosure
- Structural steel construction
- Choice of powder-coated Mild Steel or selective Stainless Steel
Grows with your business
- Modular design: the PVPE interfaces with other filling systems & check weighers
- Smart control panel: you can use the PVPE control panel to talk to your existing packers & weighers
2. Main Technical Data
Packing range | 10-50 kg |
Packing speed | 5-8 bags/min. (relates to many factors) |
Packing accuracy | ±0.5~1% |
Valve hole size | 50 mm (2’) suitable, filling spout |
Valve hole length | 90-165 mm |
Bag length | 90-180 mm |
Bag height | 300-900 mm |
Air consumption | To be specified |
Air pressure | 6-8 |
Weighing sensor | To be specified |
Display instrument | To be specified |
Air cylinder and its components | To be specified |
Electric components | To be specified |
Material feeding mode | Slow and quick two modes |
3. Air Supply
- The air supply at the packer should never fall below 5 bar. The packer will stop if it detects a pressure below 5 bar.
- The maximum air pressure is 10 bar.
- The air supply should be run in pipes which are a minimum of 1” or 25mm ID from the compressor to the packer.
4. Dust Collection
- Typical dust collection is 680 CMH Cubic Metre /Hour (400 cfm cubic foot /minute).
- This is the minimum to service 1 or 2 packers with the dust collection unit within 10metres.
- We recommend a 75mm (3”) pipe service to the packer.
- The packer has a 2” (50mm) connection so it will needs a flexible pipe and an adapter from 2” to 3”.
5. Valve Packer Layout
5. Full Automatic Line Solution
6. To Provide You the Solution, You Should Provide Us:
- Packaging Product
- Bag Size & Sample
- Only need packer or full line automatic with packer/ palletizer/ wrapping machine?
- Factory Layout
Welcome to send inquiry to us!